Thanks. Ha, yeah, can't find anyone crazy enough to hold the drift, so had to weld up something. Works good enough. Need to think of a better holder. I ended up holding the drift at the start and pounding one handed with my 8lb sledge. Once I had the pin down a little way, then I could swing away with the 16lb sledge. One more rail needs three links removed, then I'm good to go. I have a roller coming from Florin that should be in this week. They sure were nice to deal with.
One of my parts machines had track guards on it. I took those off and will put them on this machine. But all my parts rollers have dry rot seals. Florin had some of the seals, so they are on the way too. Should be a very good undercarriage once done.
1949 D2-5U w/D2N winch, 1950 D2-5U w/D2N winch, 1952 D2-5U w/ Cat blade, 1955 D2-5U w/ Cat Blade and D2N winch, 1937 RD4 wide gauge (currently non running), 1953 IH Farmall Super-A, Ford 9N, Case 580C, Hyster Sulky.